Kitchen remodel: what to expect from start to finish
Typical timeline: 2-3 weeks for design/permits, 1 week demo, 2-3 weeks rough, 2-3 weeks finish. Total: 6-12 weeks.
How long does a kitchen remodel take?
A typical kitchen remodel takes 6-12 weeks of construction, plus 2-6 weeks of pre-construction (design, permits, material ordering). Here's the breakdown: Design and permits: 2-6 weeks (longer if structural changes need engineering). Demolition: 3-5 days. Rough plumbing, electrical, framing: 1-2 weeks. City inspections: 1-2 weeks (scheduling varies). Drywall, insulation: 1 week. Cabinets: 1-2 weeks (plus 4-8 weeks lead time for custom). Countertop template and fabrication: 1-2 weeks after cabinets. Tile, backsplash: 3-5 days. Paint, fixtures, appliances: 1 week. Punch list and final inspection: 3-5 days. The biggest delays are usually cabinet lead times and permit approvals.
What permits do I need for a kitchen remodel?
Most kitchen remodels in California require a building permit if you're doing any of the following: moving walls (structural changes), relocating plumbing, adding or moving electrical circuits, changing the gas line, or altering the ventilation. A cosmetic refresh (new counters, paint, same-location fixtures) typically does not require a permit. Your contractor should pull the permits in their name - never let them suggest pulling permits in your name. Permits protect you: permitted work is inspected by the city, ensuring it meets building code. Unpermitted work can cause issues when selling your home and may void your insurance.
Can I live in my house during a kitchen remodel?
Yes, most homeowners stay in their home during a kitchen remodel. Set up a temporary kitchen in another room: a microwave, mini fridge, electric kettle, and a table. Expect dust (even with containment), noise during business hours, limited water access during plumbing work, and workers coming and going for 6-12 weeks. Tips: set clear work hours with your contractor, establish a temporary dish-washing station, keep kids and pets away from the construction zone, and plan to eat out more than usual. If you have young children or someone with health sensitivities, consider staying elsewhere during the demo and sanding phases when dust is worst.
Use our free Cost Estimator
Estimate your kitchen remodel cost - free
Related guides in Project Planning
Budget $15,000-50,000 for a mid-range bathroom remodel. Waterproofing is critical - don't let your contractor skip it.
California allows ADUs on most residential lots. Typical cost: $150,000-350,000 for a detached ADU.
Most remodeling projects in California need a building permit. Your contractor should pull permits - if they suggest skipping, that's a red flag.
Ready to compare your contractor estimates?
Upload estimates and get AI-powered analysis with CSLB license verification. Free.
Compare My Estimates →